ILLUSTRATIVE SCENARIO — All names, figures and findings are illustrative. No actual specialist work was executed, MAX produced no grade and no Guardian review occurred.
Sample 05 / 06 · Factory Site & Supply Chain
$78M Factory Location Decision
A electronics manufacturer compares hypothetical sites in Central Florida, North Texas and northern Mexico for a new assembly plant. No site has been sourced or evaluated.
Example client request
“A electronics maker compares Central Florida, North Texas and northern Mexico for a new assembly plant.”
$78M
Project budget
Illustrative total capital investment
3
Locations
Hypothetical geographic alternatives
2029
Target start
Synthetic operations schedule
Executive Summary
Illustrative committee readout
Do not select a site on wage cost alone. Compare fully loaded, risk-adjusted cost after utilities, logistics, incentives, uptime, customs, workforce and permitting. Secure binding site-specific data before a location decision or incentive negotiation.
Research questions AI Team One would investigate
Labor and workforce
Recruitable skilled labor, wage inflation, turnover, training partners and time-to-hire.
Utilities and resiliency
Power capacity, rates, lead times, water, backup systems and weather interruption exposure.
Supply-chain geometry
Inbound parts, outbound delivery, port/rail access, freight, customs lead times and inventory buffers.
Legal and policy
Site permits, labor and environmental obligations, customs and trade rules, incentives and clawbacks.
Five-year economics
Build-to-occupy cost, ramp inefficiency, taxes, incentives, currency, working capital and downtime.
Execution feasibility
Land title, engineering, construction labor, vendor concentration and critical-path timetable.
Illustrative diagnostic flags
Not verified findings
- Cheap is not always low costIllustrative lower labor cost can be offset by inventory and border delays.
- Utility bottleneckUnverified electric capacity may make a nominally attractive site infeasible.
- Incentive conditionalityHeadline grants may require jobs, capex thresholds or reimbursement timing.
Socratee's Critical Thinking Perspective
Board question · sample text, not generated
“Which location maximizes risk-adjusted cash flow and execution certainty under several demand and policy scenarios?”
Research & Review Record
Site Selection Intelligence Blueprint
The site labels are broad regions, not real parcels. Costs are sample figures and are not estimates for those markets.
Evidence plan: what must actually be collected
- Parcel and permitsSpecific addresses; zoning records; title; engineering and environmental studies.
Output: buildability, permitting route and schedule - LaborJob-specific wage surveys; local workforce boards; competitor hiring data.
Output: recruitable labor supply and ramp plan - UtilitiesUtility written capacity offers; rates; water needs; backup and redundancy plans.
Output: service date, operating cost and resiliency - Logistics / tradeFreight quotes; customs counsel; origin rules; supplier lanes and service levels.
Output: all-in delivered cost and border sensitivity - Incentives / financeWritten incentive proposals; clawbacks; tax counsel; capex bids and FX hedging.
Output: risk-adjusted five-year NPV and board case
Example: illustrative operating-cost model
Illustrative $M annualized full-cost run rate. Excludes upfront construction spending.
Hypothetical regionCentral FL
- Labor + ops
- $13M
- Logistics
- $4M
- Other
- $6M
- Total / yr
- $23M
Hypothetical regionNorth TX
- Labor + ops
- $14M
- Logistics
- $5M
- Other
- $6M
- Total / yr
- $25M
Hypothetical regionNorthern Mexico
- Labor + ops
- $10M
- Logistics
- $5M
- Other
- $4M
- Total / yr
- $19M
What independent challenge and safeguards would examine
SOCRATEE + RED
Would challenge hidden freight and inventory costs, supplier outages, policy changes, exchange rates, permitting delays and overestimated incentives.
LIBBY + MAX
Would flag jurisdiction-specific counsel requirements, data provenance and assumptions that cannot yet be validated. No independent score exists.
Proposed role routing · Not executed
TED coordinates • RES collects site data • KNOLLY reconciles quotes • SOCRATEE tests tradeoffs • LIBBY flags legal constraints • RED runs disruption scenarios • MAX evaluates evidence quality.
Actual record
- Actual agent executions: 0
- MAX independent grade: No grade. Not run.
- 18 Guardians: No review occurred. Built · Integration Pending.
- Final decision: Always a human decision.
Evidence labels
Sample scenario · Unverified illustrative content · 0 actual agent executions